In vROPS Reports are used to share the operational status information with stakeholders.
What's New in vROPS 7.5 Reports
1. Colorization = If View is also configured with the colorization (See this Post) then it can also be added in the PDF Generated reports too.
Toggle this Colorization Switch as shown in the screenshot
Now generate the report and you can see the same colorization which you have configured in View is in the report too, as the screenshot of generated report is shared here too.
2. Enhanced Report Scheduling
What's New in vROPS 7.5 Reports
1. Colorization = If View is also configured with the colorization (See this Post) then it can also be added in the PDF Generated reports too.
Toggle this Colorization Switch as shown in the screenshot
Now generate the report and you can see the same colorization which you have configured in View is in the report too, as the screenshot of generated report is shared here too.
2. Enhanced Report Scheduling
- Ability to schedule report delivery with custom time options.
- Ability to schedule report delivery daily.
- Ability to add Copy (CC) and Blind Copy (BCC) for report delivery via emails.
In vROPS 7.0 As you can see options are very less for scheduling the reports
In vROPS 7.5 we can schedule based on quarter hour basis and as well as daily report you can schedule too rather than selecting each and every day manually
No comments:
Post a Comment